Scenario:
Project management firm needed over 400 audits performed out-of-state within a 6-week period.
Challenges:
Results:
Rather than utilizing multiple vendors, FEC provided a single resource to complete the entire projects within the specified time frame. Allowing the client to work with only one vendor led to optimum project efficiency.
Copyright Fullerton Engineering Consultants, Inc. 2012