Scenario:
Tower owner was faced with challenge of building a RF Transparent church steeple to meet jurisdiction requirements. FEC was engaged to coordinate the design.
Challenges:
Results:
Drawings and calculations were approved and permitted by local jurisdiction within schedule. Client successfully built project to property owner satisfaction.
Copyright Fullerton Engineering Consultants, Inc. 2012