Project Overview

A major higher education institution and Fullerton’s client were working together to design a Distributed Antenna System (DAS) for their football stadium. The Scope of Work included an iBwave design, with a significant number of nodes and a head-end equipment room large enough to accommodate multiple wireless providers, as well as the neutral host system. The project schedule was under intense pressure to be completed prior to the beginning of the football season.

Project Challenge

To better define the scope of work on behalf of our client, as the institution required greater A&E involvement and detailed design than originally anticipated.


The Fullerton Strategy

Fullerton provided the expertise necessary to better define the Scope of Work, offer value engineering and ultimately to provide full A&E turnkey services, which satisfied the design needs of both parties. Extracting from the original iBwave file, Fullerton developed complete architectural and engineering construction documents, including exact physical locations and quantities of all nodes, cable path design, structural details and head-end room design. Fullerton received high praise from both the higher education institution and the client for its expert consulting services, which were delivered within budget and reduced the overall project schedule.